Handover condition
A bare-shell requirement may involve a different scope from leaving an approved existing fit-out or performing minor repairs. Start with the lease and the landlord's written schedule.
HONG KONG OFFICE EXIT COST GUIDE
Before comparing prices for 清拆還原 (strip-out and reinstatement), compare what each quote includes. The work needed depends on the tenancy and the landlord's required handover condition.
We do not publish an unsupported fixed price per square foot. We first review the agreed scope, photographs and building requirements.
A bare-shell requirement may involve a different scope from leaving an approved existing fit-out or performing minor repairs. Start with the lease and the landlord's written schedule.
Desks, filing cabinets and loose furniture are different from fixed partitions, joinery, ceilings and equipment. Count the items and distinguish what stays from what goes.
Electrical, fire services, air-conditioning and regulated building works may require separately appointed qualified contractors and approvals. Their availability, requirements and costs should be confirmed before booking.
Goods-lift slots, after-hours restrictions, floor protection, loading access and nominated contractor requirements can change the time and resources needed.
Sort reusable furniture and other waste streams where feasible. Construction-waste transport and disposal should follow applicable Hong Kong requirements and the responsible contractor's arrangements.
A short lease-end window, multiple contractors, delayed building approvals or a last-minute change in the landlord's checklist may change scheduling and costs.
Ask every provider to price against the same landlord and office inventory information. A low total does not help if the building needs additional works later.
Hidden cost of DIY contractor coordination
When you hire movers, clearance crews, painters and cleaners separately, the risk sits entirely on your company. If one contractor replies slowly, fails to attend a booked goods-lift slot, or misses a landlord requirement, the whole handover schedule slips. That often triggers urgent rework, extra rent or extension fees, and a delayed rental deposit return.
See how single-contact office exit management works →Gather the lease-end date, landlord handover checklist, current photos, furniture list and the building's permitted loading and works hours. Remove unrelated private information from lease excerpts.
If the scope involves regulated minor works, consult appropriately qualified professionals and the relevant Hong Kong Buildings Department minor works procedures. For construction-waste arrangements, see the Environmental Protection Department guidance. These are regulatory references, not a claim of accreditation by those bodies.
No single square-foot figure covers all handover conditions. A small space with regulated systems and restricted access can differ materially from a larger space needing only loose furniture removal and cleaning. Compare the written scope and exclusions.
Yes. If your lease requires only agreed loose items removed, request a furniture-clearance scope. Additional reinstatement work should only be included when necessary and confirmed.
Bare shell describes a possible handover condition, not a universal checklist. Ask the landlord or building management which finishes, partitions, ceilings and services must be removed, retained or restored.
Photos and a list can help us assess an initial scope. Complex or hidden conditions may require an onsite assessment or specialist review before a firm written quote is possible.
No. Completion photos can document performed work, but landlord acceptance and deposit handling depend on the lease and third-party decisions.
Send photos, a list and the relevant handover conditions. We will assess which work can be coordinated and provide agreed inclusions and exclusions in writing.
Send my office scope →